Solar guide

Download PDF brochure

Submital of Required Documents

Must be completed, signed and dated

Agreement
Application – $100 application fee must be paid at time of submission
• Insurance Requirement
• W-9 Requirement

System Size Limitation

• Based off of the members’ peak demand or highest hourly usage (AC Size only)

Installation Requirements

• 1-line diagram of the system to be installed
• Disconnect installation – located within arm’s reach and visible from the meter
• Proper signage on the disconnect and meter can
• Additional #6 Bare ground wire that comes from the disconnect to the existing house ground
• This ensures that there is no potential difference between the disconnect and the meter
• Connections must be made inside the member’s breaker panel
• No connections are to be made inside the meter base, this is considered tampering and may result in a tampering fee.

Following the Solar Installation

• Notify Aiken Electric Cooperative (AEC) and Aiken County that it is ready for inspection
• Aiken County must inspect and pass solar installation
• Following inspection approval, AEC will perform a final inspection to ensure it follows all installation requirements deemed by the Cooperative

After Inspection

• If requirements are NOT met, AEC will notify the solar company and schedule new inspection
• If requirements are met, the meter department will be scheduled to install a bi-directional meter in place of the existing meter
• There is a 2-week turnaround time for the meter change
• DO NOT LEAVE SOLAR SYSTEM ENERGIZED AFTER TESTING – the system should only be energized once AEC completes meter change
• Member is notified when bi-directional meter has been installed

Aiken Electric Cooperative does not sell, install, or make any recommendations in regards to the installation of solar panels. However, we do recommend to do your research on the company that you are working with and to notify Aiken Electric Cooperative prior to purchasing your solar. *
Availability

Available in all territory served by the Cooperative, in conjunction with the appropriate Cooperative’s Rate Schedule, subject to the Cooperative’s Service Rules and Regulations. Furthermore, this Rider is available on a first come, first serve basis, except that the total capacity of all consumer-owned generating systems, served under this Rider, shall not exceed a limit determined by Government, Central Electric Power Cooperative, and in accordance with Exhibit A of Rate Schedule DER.

Have a question? please contact bryce brazel at (803)502-2676 for additional information on the residential and community solar